Vai al contenuto
Torna indietro
S

Salma Shafi ha creato il progetto «Designing Resource-Saving Solutions Together» su Class2Class.org

Richiedi di partecipare
Inattivo
Pubblico
Collabora con un'altra classe

Designing Resource-Saving Solutions Together

Di cosa tratta questo progetto?

Joint teams design and build a working prototype, such as a rainwater collector, a classroom recycling system, or a reuse poster campaign, adapted to their local context. They test their creations, share them through a video call, and gather feedback...
Età degli studenti
9-12 anni
Durata del progetto
3 settimane
Mese di inizio
Dicembre 2026

Obiettivi di apprendimento

Students will be able to identify local water or waste challenges in their community and describe how partner classes face similar or different problems.
Ricordare / Comprendere
Students will be able to apply the "How might we...?" framing to define a local problem and use it to guide their joint team's prototype plan.
Applicare
Students will be able to compare their prototype design and test results with those of partner classes, analyzing which features work best in different local contexts.
Analizzare
Students will be able to evaluate feedback from partner classrooms during video-call sharing and judge how it can improve their prototype's effectiveness.
Valutare
Students will be able to design and build an improved resource-saving prototype, such as a rainwater collector or recycling system, adapted to their local context.
Creare

Competenze da sviluppare

Creatività e innovazione
Pensiero critico e problem-solving
Collaborazione e lavoro di squadra

Attivita del progetto

1

Meet the partner class and map local water and waste challenges

Students introduce themselves to the partner class and list water or waste problems they notice in their own community. They compare their list with the partner class to see which challenges are similar and which are different.

Durata: 45 minuti
2

Frame a local problem with "How might we...?" and plan a joint prototype

In joint teams, students pick one local problem and write it as a "How might we...?" question. They sketch and plan a simple resource-saving prototype, such as a rainwater collector, recycling system, or reuse poster campaign, adapted to their local context.

Durata: 90 minuti
3

Build, test, and refine the prototype using recycled materials

Teams build their prototype from recycled materials and test how well it works. They record test results and make changes to improve it before the sharing session.

Durata: 120 minuti
4

Share prototypes on a video call and gather partner class feedback

Teams present their prototype and test results to the partner class on a video call. Partner classes give feedback, and students note which features work best in different local contexts and which changes they will make.

Durata: 60 minuti
5

Present the improved prototype and reflect on what was learned

Teams show their improved prototype to the class and explain the changes made after feedback. Students reflect on how the partner class's ideas shaped their solution and what they learned about working across cultures.

Durata: 45 minuti